The operator fills the bobbin trains at the roving frames with full bobbins. Then the train is manually pulled to the spinning frame. There the operator of the spinning frame can exchange the full bobbins against the empty bobbins. The train with the empty bobbins is afterwards pulled back to the roving frames.